engine

AEROSPACE AND CHEMICAL PROCESSING

Photo By Sanjay Acharya Executive Summary: In 2011 Kredit Automation was contracted to upgrade the controls on a system with two important processes: Fluoride Ion Cleaning and Chemical Vapor Deposition. This important…


panel

PanelView Upgrade

We recently upgraded a customer’s almost illegible PanelView 600 to a PanelView Plus 1000 compact with a bright color display. The new display is easy to read and operator friendly! This PanelView is connected to a SLC 5/03…


indian bend

INDUSTRIAL WASTEWATER TREATMENT SUPERFUND SITE

Executive Summary: Kredit Automation & Controls did a retrofit to upgrade the controller and operator interface at the Indian Bend Wash area superfund site. This is a treatment facility that removes volatile organic…


press

3000 Ton Aluminum Extrusion Press

Customer: Alcoa Engineered Products – PIMALCO plant Machine: 3000 Ton Sutton Aluminum Extrusion Press Work Completed: • Allen-Bradley PLC2 to ControlLogix upgrade for all press, material handling, die change and billet…


press

EXTRUSION PRESS CONTROL SYSTEM RETROFIT

Executive Summary: Kredit Automation has done over a dozen aluminum extrusion press control system retrofits. Extrusion presses last for decades and periodically need a new control system. Protection against obsolesce and…


furnace

EMERGENCY CONTROL SYSTEM REPLACEMENT

Executive Summary: A fire destroyed the entire control system for the melting and holding furnaces at the cast house plant of an aluminum extruder. Panels, controllers, terminations, operator interfaces…everything destroyed.…


hmi

BATCH PROCESSING AND BUILDING MATERIALS MIXING

Executive Summary: Kredit Automation was contracted to retrofit the PLC and HMI (and the software programs for both) on a batch process that combines solid and liquid materials from silos and tanks to produce building…


industrial

FURNACE COMBUSTION CONTROL

Executive Summary: A new control system was needed for the melting and holding furnaces at a casting operation. The old one had been destroyed by fire and so the design-build cycle was compressed to weeks. The old controls…